A ZIP code is a starting point for location, not an assessment of your roof. Shading, roof condition, usable space, and household needs all belong in the conversation.

Prepare a small project folder.

  1. Roof information: age, material, known repairs, and any planned replacement.
  2. Shading observations: trees, nearby structures, and areas shaded at different times.
  3. Electricity use: recent bills and changes you expect in the coming year.
  4. Existing equipment: solar, battery, generator, or EV charging documentation.
  5. Your priorities: daytime generation, backup, or both.

Keep estimates separate from approvals.

A solar production model is an estimate. A qualified assessment still needs to address the property, installation requirements, and the utility’s process. Ask which assumptions are included and what remains to be checked.

Useful next question: “What would make this property unsuitable, or change the proposed system?” Ask it before committing to equipment.
Further reading

DOE: Homeowner’s Guide to Solar ↗

Source checked September 27, 2026. General education; equipment and site-specific requirements need a qualified review.

Next: A better brief for a business or microgrid project. ↗